South Africa reopens vital rail corridor to world markets after storm damage

The first part of the reopening came on July 31, when diesel-hauled trains resumed operations on the Cape Mainline.

Omokolade Ajayi
Omokolade Ajayi
South Africa’s state-owned logistics operator Transnet.

South Africa’s state-owned logistics operator Transnet has completed the restoration of the Cape Mainline after severe storms damaged sections of the railway in May, disrupting freight services along an important link between Cape Town and the country’s inland rail network.

Heavy rainfall, strong winds and flooding on May 11 and 12 damaged railway infrastructure at several locations, forcing parts of the line to remain closed for more than two months, Transnet Rail Infrastructure Manager (TRIM) said in a statement.

Transnet repairs restore Cape Mainline route

The Cape Mainline is a major mixed-freight route carrying containers, agricultural products, industrial goods and minerals between the Port of Cape Town and South Africa’s inland economic centers. The disruption affected a route used to move goods between the port and markets across the country.

TRIM said the repair work included rebuilding sections where floodwater had washed away the rail formation and supporting structures. Teams also repaired track infrastructure, restored overhead equipment and replaced mast poles damaged by the storms.

The work covered five damaged sites in the Worcester area and two major washaways at Leeu-Gamka in the Karoo region. TRIM said it brought together its own teams and outside contractors to carry out the repairs and return the line to service while maintaining safety standards.

South Africa Cape Mainline fully reopens

The first part of the reopening came on July 31, when diesel-hauled trains resumed operations on the Cape Mainline. Electric trains returned in August after the replacement and testing of the overhead equipment were completed.

“The reopening of the Cape Mainline reinforces TRIM’s commitment to maintaining a safe, reliable and resilient rail network and responding decisively to infrastructure disruptions caused by extreme weather,” TRIM Chief Executive Moshe Motlohi said.

The restoration returns the full route to service after the May storms, restoring an important rail link for freight moving from the Port of Cape Town to South Africa’s inland markets and supporting the flow of goods along the corridor. 

Subscribe

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]

Share This Article